Petrojet

Zohr gas field development

Construction of an onshore Gas complex (phase 1) with a production capacity of 1.4 BCFD.

The offshore field development includes fabrication of control platform & deep water structures in addition to coating of subsea pipelines. Zohr Offshore field is located 180 km off the onshore plant in the Mediterranean sea and at a depth of 1450 m. The field has a total potential of about 30 TCF in place.


Project Type :
Gas Processing Plant
Location :
Port Said
Country :
Egypt
Client :
PETROBEL / ENI

Certified: ISO 9001- ISO 14001
OHSAS 18001 - ISO 17025
ASME Stamps - API Q1 - Hull Structures