The project is Consortium between ENPPI And PETROJET Engineering, procurement, fabrication, Pre-commissioning, and Commissioning assistant for Offshore Production Unit with Drilling offshore Jack Up …
Country : EgyptClient : petrosalam

Construction of a gas pipeline with a total length of 165 km and diameter of 42″ 1st Stage 92 km from El tina VR to Abu-Sultan 2nd Stage 73 Km from Abu-Sultan to New Capital
Country : EgyptClient : Gasco/Egas

Execution of a Gas Trunk Pipeline with total length of 126 km from Nooros to El Gamil passing by Abu Madi Plant in order to increase the extraction of butane and gas supply to UGDC Company’s plant fo …
Country : EgyptClient : PETROBEL

Joint Venture ( Petrojet- Ballestra ) Engineering, Procurement, Construction of phosphate fertilizer complex package 2 at Ain EL-Sokhna. the complex includes 5 plants for the production of phosphate a …
Country : EgyptClient : El Nasr Co. for intermediate chemicals

Execution of the third phase of residential and administrative project on 150 feddans. It consists of (72) residential buildings.
Country : EgyptClient : National Defense Council

Construction of an onshore Gas complex (phase 1) with a production capacity of 1.4 BCFD. The offshore field development includes fabrication of control platform & deep water structures in addition …
Country : EgyptClient : PETROBEL / ENI

Development of gas treatment plant at Burullus to treat gas received from the offshore fields Taurus, Giza fayoum, & Raven. Petrojet scope of work is construction, E & I works. in addition to …
Country : EgyptClient : Bp

Rehabilitation of Burulus facilities for gas processing plant of Taurus/Libra wells which have the capacity of processing 600 MMCFD
Country : EgyptClient : BP

Development of a Greenfield 1.3 million ton per year methanol facility at Damietta on the Mediterranean Sea in Egypt.
Country : EgyptClient : Techint - (Egyptian Methanex Methanol Company)

Execution of Civil, Mechanical works, steel structure, equipment and pipelines installation and Electrical works
Country : EgyptClient : GS Engineering & Construction

Construction of a petrochemical complex at Port Said, North of Egypt, consisting of a Propylene plant and a Polypropylene plant with respective annual production capacities of 350,000 tons as well as …
Country : EgyptClient : UHDE - (Egyptian Propylene & Polypropylene Co. (EPPC)

The establishment of a complete Ammonia/Urea complex including off sites facilities and interconnection to Abu-Qir (1 & 2) with an Ammonia production capacity of 1200 ton/day and Urea Production C …
Country : EgyptClient : Alexfert co./UHDE Gmbh

A major Egyptian national development project started on August 2014, with the aim of maximizing the role of Suez Canal region as an integrated industrial and economic logistic hub, which will contrib …
Country : EgyptClient : Engineering Authority for Armed Forces

Developing the extraction with phenol unit to be replaced by N.M.B for saving environment, and increasing production capacity to 283 KT/year
Country : EgyptClient : Al- Amreya Petroleum Refining Co.(APRC)

Dry excavation of New Suez Canal at the section 88km to 89km with total volume 11 million m3
Country : EgyptClient : Engineering Authority for Armed Forces

Construction of the SCCT onshore works of Phase II on an area of 640,000m2 in addition to expansion works of the facilities and services of Phase I already in operation.
Country : EgyptClient : Suez Canal Container Terminal Co.

Maximizing the efficiency of Gas Recovery Unit to increase LPG production to 400 KT/year
Country : EgyptClient : ASORC

EPC for Two-way road ( Two-way road of Three-Lane / side (1 Concrete Lane for Heavy Loads) ) including associated construction works Total Length: 20 km Total width: 23,5 m
Country : EgyptClient : General Authority for Roads, Bridges & Land Transport

A natural gas liquids extraction facility relying on natural gas produced from North East Mediterranean fields (Al Temsah, Port Fouad, Habi, and Akhen) to extract natural gas derivatives. It is design …
Country : EgyptClient : United Gas Derivatives Company (UGDC) (JV formed of EGAS, BP & IEOC , AGIP)

EPC of 5th section of Benha/Alexandria road including associated construction works of interchanges, Bridges, and crossings Total length: 19 Km Total width: 42 m Two-way road of four-lanes/sides
Country : EgyptClient : General Authority for Roads, Bridges & Land Transport

Project aims at increasing the gas production at BED-3 up to 200 MMSCFD by bringing gas from newly discovered wells at Karam (5 Wells) and Assil (2 Wells) online. Development includes a new CO2 Remova …
Country : EgyptClient : Enppi - (BAPETCO / SHELL)

EPC for Two-way road including associated construction works Total Length: 55 km Total width: 23,4 m Two-way road of Three-Lane / side
Country : EgyptClient : General Authority for Roads, Bridges & Land Transport

EPC of 3rd corridor at 6th of october city for the section connecting Zewail university with Wahat road, including associated construction works. 2 way road (11M width) 2 concrete lanes for heavy load …
Country : EgyptClient : 6th Of October City Authority

Building a Touristic Resort on an Area of 75,420 m2 at Ain Sokhna on the Red Sea Coast.The Resort includes the following: Chalets Area • Hotel Area Services Area • Landscape Beach Area
Country : EgyptClient : PETROJET

Jacket, Deck & TSF Sea-fastening
Country : EgyptClient : PETROBEL

Execution of PETROSPORT Sportive City at New Cairo on an area of 45 Feddans including: Outdoor court complex (football, volleyball, basketball, handball, and tennis) Swimming pool • Food court • …
Country : EgyptClient : Egyptian Sportive Services Company for Petroleum Workers (PETROSPORT)

Platform Details: Weight : 3618 Ton Water Depth : 80 m Scope of Works: Fabrication, Load Out and Sea-Fastening.
Country : EgyptClient : GUPCO .

Execution of the concrete structure and finishes to the number of (20) Residential Buildings composed of Six levels include core, shell and finishes for the project buildings and units.
Country : EgyptClient : Engineering Authority of Egyptian Armed Forces

Weight : 2163 Ton Water Depth : 61 m Scope of Works: Fabrication, Load Out and Sea-Fastening.
Country : EgyptClient : Burullus.

Execution of 30 Residential Buildings composed of (4) levels including core, shell and finishing works
Country : EgyptClient : Engineering Authority of Egyptian Armed Forces

Platform Details: Weight : 3210 Ton Water Depth : 33 M Scope of Works: Fabrication, Load Out and Sea-Fastening.
Country : EgyptClient : Abu-Qir Petroleum

Execution of 10 residential buildings composed of (6) levels including core, shell, and finishing works within the housing project for the members of the Armed Forces in Future City
Country : EgyptClient : Engineering Authority of Egyptian Armed Forces

Platform Details weight : 2400 Ton Water Depth : 23.5 M Project scope of work Procurement, Fabrication, and pre-commissioning
Country : EgyptClient : General Petroleum Company - GPC Project

Building PETROJET’s New Corporate Head Quarter at New Cairo (5th Settlement) on an area of 17,000 m2 as follows: Main Building: 3,100 m2 West Wing : 775 m2 South Wing : 775 m2 Parking : 9,000 m2
Country : EgyptClient : PETROJET

Platform Details: Weight : 1055 Ton Water Depth : 25 M Scope of Works: Design, Procurement, Fabrication, Load Out and Sea-Fastening.
Country : EgyptClient : Aquaterra

Building ECHEM New Admin Building at New Cairo on an area of 3,000 m2 comprising of a basement, ground floor and four typical floors in addition to a 4,200 m2 auditorium and a 2,225 m2 Services Buildi …
Country : EgyptClient : Petrochemicals Holding Company (ECHEM)

Platform Details: Weight : 2260 Ton Water Depth : 800 M Scope of Works: Fabrication, Load Out and Sea-Fastening in Taurus & Libra fields.
Country : EgyptClient : BP / Subsea 7

Building Tharwa New Admin Building at New Cairo on an area of 4,200 m2 consisting of a basement, ground floor and four typical floors
Country : EgyptClient : Tharwa Petroleum Company

Platform Details weight : 6000 Ton Water Depth : 90 m Project scope of work Fabrication, Load out & sea-fastening
Country : EgyptClient : PETROBEL

Building MIDTAP New Admin Building at New Cairo on an area of 4,400 m2 consisting of a basement and four typical floors
Country : EgyptClient : Middle East Oil Tankage and Pipelines Co. (MIDTAP)

Platform Details weight : 2498 Ton Water Depth : 1500 M
Country : EgyptClient : saipem

Construction of Dry Cast Plant inside Al Adabiya port in Suez in two phases on the western coast of Suez Gulf, and it is 17 km away from Suez City
Country : EgyptClient : General Authority for the Suez Canal -SCZone

Execution of stage II of the Port Said East Port Main Road. The road passes through an area used before for over 20 years as a dumping area for the dredged soil from the Suez Canal, and reached a heig …
Country : EgyptClient : Port Said Port Authority

Execution of all construction and finishing works for the navigation complex including a 39m high navigation tower, an administration building on an area of 1200 m2 an underground tank, a power statio …
Country : EgyptClient : Port Said Port Authority

Civil, Mechanical and Electrical works for (7) storage tanks with a capacity of 2400m3
Country : EgyptClient : Petrogas

Civil, Mechanical and Electrical works for (2) storage tanks with a capacity of 4000 m3 and (2) storage tanks with a capacity of 2400 m3
Country : EgyptClient : Petrogas

Engineering, Procurement & Construction of spherical Tanks (5000m3/ton )
Country : EgyptClient : The Egyptian General Petroleum Corporation (EGPC

Construction of 6 x175,000 m3 Cylindrical Tanks with associated Civil, Piping & Electrical works at Ain Sokhna Terminal
Country : EgyptClient : Arab Petroleum Pipeline Co. (SUMED)

Engineering, Procurement (Except Plates) & Construction of (3) Storage Tanks (120,000 m3 / tank) to increase the Storage capacity for SUMED Co. at Sidi Krir.
Country : EgyptClient : Arab Petroleum Pipeline Co. (SUMED

Equipment Details: Weight :625 Ton Material :C.S. Internal Diameter : 3 – 5 m Length :35 m Plate Thickness : 45 mm
Country : EgyptClient : Suez Oil Processing Co.

Equipment Details: Weight : 380 Ton Material : SA 240-304 Internal Diameter : 4.5 m Length : 38 m Plate Thickness : 76 mm …
Country : EgyptClient : UGDC

Developing Midor Refinery Plant – Pre-flash Tower Unit to increase production capacity by 15% (115 Ton/year)
Country : EgyptClient : Midor

A two – train Liquefied Natural Gas (LNG) plant each with a capacity of approximately 3.6 MT/Y on approximately 165 hectares of land located 3 km from the town of Idku and 40 km East of Alexandria on …
Country : EgyptClient : Bechtel - (Egyptian Liquefied Natural Gas Co. (ELNG) (JV formed of EGAS, EGPC, BG,Petronas & Gas de France)

The target of the project is to increase the productivity of El Salam gas station to 410 MMCFD by doubling the processing units to 4 units then transporting the processed gas by el Obayed /el Amerya p …
Country : EgyptClient : Petrofac - Khalda Petroleum Co.

Development of a Linear Alkyl Benzene Plant in Alexandria, North of Egypt with a production capacity of 100,000 Tons/Year. Plant consists of Process Unit–Utilities – Storage Facilities – Service Build …
Country : EgyptClient : ELAB

A project aiming at increasing the production of the C2 – C3 by introducing modification in both Amereya LPG recovery plant and the WDGC in addition to the installation of new facilities at both plant …
Country : EgyptClient : Egyptian Natural Gas Company

Construction of a 460,000 tons/year Ethylene Plant & 400,000 tons/year of Polyethylene Petrojet is responsible for full construction scope in addition to fabrication of process equipment
Country : EgyptClient : JV (TOYO/ ENPPI

Pipe coating works, and civil, mechanical, and electrical works for Ain Sokhna/Wadi hagool/ Al-Hafayer (30”- 42 km) crude oil Pipeline from station (6) at Ain Sokhna to Al Hafayer valve room
Country : EgyptClient : Petroleum Pipelines Co. PPC

Engineering, Procurement and Construction of 42”-50 km Pipeline including 23 HDD crossings to connect Al-Gamil valve rooms to New Damietta electric station
Country : EgyptClient : GASCO

Execution of a Gas Pipeline from Dahshour to Aswan as part of the National Plan for developing Upper Egypt. The pipeline was executed over a number of segments starting from Kuraimat up to Aswan passi …
Country : EgyptClient : Egyptian Natural Gas Co.GASCO

Material : C.S, S.S, and Alloy / Unit Capacity : Up to 5100 m3/day Dimensions : Up to D: 2.7 m L: 14 m Thk: 74 mm
Country : EgyptClient : General Petroleum Company - GPC Project

Material : C.S, S.S, Cladded and Duplex Weight : Up to 220 Ton Dimensions : Up to 21m x 6 m x 6.5 m
Country : EgyptClient :

Material : C.S, S.S & Alloy Material Weight : Up to 160 Ton Dimensions: Up to 14 m x 5.5 m x 4.2 m
Country : EgyptClient : Burullus Gas Company

Equipment Details: Weight : 175 Ton Material : SA 516-70 Length : 60.9 m Plate Thickness : 24 mm
Country : EgyptClient : UHDE Gmbh

Equipment Details: Weight : 147 Ton Material : SA 516-70 Internal Diameter : 5 – 3.2 m Length : 35.6 …
Country : EgyptClient : GASCO